Posted by: maxwellar | September 19, 2010

Cabin update Sept 18

I went up to the cabin again this weekend to work.  I took a day off work and went up Friday Morning with Linda and two of the grandkids. Braxton and Michael.(Katie’s two kids).  I got quite a bit done.  I intalled the 6 foot window in the front bedroom, installed a wall at the top of the stairs in the loft on the left side, Finished the logs where the old door was taken out for the front bedroom. (Outside door), and started installing the wood paneling in the Great room.
I also had a great lunch Saturday (Thanks Diane, Earl, Ann, and Mom and Dad for letting me horn in on the monthly siblings get together.)

Here are the pictures of the progress:

Advertisements

Responses

  1. Looks like you’ve made some great progess. 🙂


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

Categories

%d bloggers like this: