Linda and I spent four days at the cabin this weekend working.  We got a lot done and just wanted to share the cabin progress with all of you.

1. We got the front bedroom textured, painted and a bed installed.  (We can now actually get some sleep at night while we are up here working)

2. We got the cement poured in the back bedroom (filled in the hole from when the water lines were put in for the bathroom.  This took about six hours of hard work, I’m getting to old for this LOL)

3. Put in the header for the back bedroom closet and framed it in for closet doors.

4. Linda and I have about 1/3 of the sheet rock done in the back bedroom.

5. Replaced the window in the back bedroom.

6. Put in the new window on the North end of the loft. (You can get a nice breeze through the loft now during the day to cool things off.

Here are pictures of what was done this weekend.

Advertisement

Responses

  1. It all looks so amazing!

  2. Holy!! you have gotten SO much done!


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Categories

Follow

Get every new post delivered to your Inbox.